2018年1月24日 星期三

Construction technology of household door and window cover


Doors and Windows cover the function of protecting wall side line, door and window cover can connect the close of interior decorative material, and still have very good adornment effect. The base course of door window cover is the part that is closely related with quality of door window, so, in construction when must very careful and timely acceptance. But common owner does not know the knowledge of base course of door window casing construction, do not matter nevertheless, come to understand the construction craft flow of door window casing completely below, notice a matter and acceptance standard.
Construction technology of household door and window cover
You will get to see a long list of the top Interior Design in your area, their reviews as well as testimonials from other clients. The most reliable interior designers are those with years of experience and a long list of happy clients.
I. construction process flow of door and window cover
1, check the material selection of qualified at the grass-roots level in the wooden keel and 15 ㎜ joinery board or fiberboard as base material. Check at the grass-roots level before construction wall flatness error more than 30 ㎜ adopt corresponding measures wall damage larger in wood at the grass-roots level to prepare for application of cement mortar little flat after rear can surface.
2, doors and Windows set joinery board at the grass-roots level set material blanking out with a dry wood wedge fixed firmly at the grass-roots level 5 ㎜ prevent water from the ground. Cover plate using white latex, nails fixed white latex should be brushed even enough to repair the edge of the strictly prohibited panel.
3, door leaf thickness generally about 38 ㎜ outfit lock opening special reinforcement carpentry board to do cross processing to prevent deformation.
4. Door and window fan installation: door and window are 5-8mm away from the ground (the height of the surface layer), and 2-3mm between the left and right upper side of the door fan and the door gear. The door and door gear are closely connected, and the hinge distance is no more than 2mm, which is 1/10 of the vertical height. Install door fan to involve to grind arenaceous glass fashionable dress after good, should hit right amount of glass glue in smooth surface part to protect vitreous kitchen and bathroom to grind arenaceous face to should outside the junction outside outdoor arenaceous face should grind arenaceous face inward.
There are other regular facilities available in Stanford Service apartment hongkong causeway bay like laundry service, newspaper and flower service. Taxi booking and car rentals can be accessed at any time and non-regular services like emergency medical services and Business center services can be accessed at a single call
5. The installation hinge shall be tightly closed with the opening and closing of the double side slot door on the door fan and the door frame.
6. The lock height from the ground is 900-1000mm(lock center). The lock hole should be in the correct position. After the lock is installed, it must be wrapped to protect against pollution.
7. Sliding door: the track within 1500mm of door and window fan USES small sliding track; 1500-2000mm medium size; Large slide rails are used above 2000mm. When determining the width of double track sliding door door, the intersection edge of two door fans should be more than 10mm overlapping at . Horizontal vertical seam should be even, close, hidden sliding door should be installed in the door fan and debugging qualified before sealing.

沒有留言:

張貼留言